Scottsculpturestudio

 
 

           Home   |   Ceramics   |    Stone  |   Bronze  |     Painting    |   Contact  |

The ArtBarn Project - Summer 2007

Just poured the slab. Exciting beginnings, but a long haul ahead

The walls going up, windows on one side only, big canvases on the other.

Single block construction, height at ridge 4m.

Starting to cut in the roof timbers. Large area on the south side for working outside

Weird offset elevation designed to give maximum height above internal gallery facing west.

inside the roof lights and large windows flood the area with light

 

south facing desk

From the back looking out the large south facing windows.

 

 

 

 

 

 



                                              

Return to Home